Stop planning in Excel with infinite capacity assumptions. Our AI-driven scheduler respects machine constraints, maintenance windows, and raw material availability to create executable plans.
Which job should run next? It's not just "First In, First Out". Our AI calculates a composite score for every work order based on Due Date Slack, Customer Tier, Energy Cost, and Material Readiness.
Schedule meets Inventory. Our system "explodes" the BOM (Bill of Materials) for every scheduled job and checks component availability in real-time.
We design measurable KPIs from day one so you can track impact by line, plant, and product family.
Planning Efficiency
Planner time spent on manual Excel re-scheduling.
Service Level
Improvement in OTIF / DIFOT for key customers.
Stability & Loss
Unplanned changeovers, urgent re-runs, and waiting time.
Material Shortage
Production stops due to missing RM/PM after go-live.
Plan vs Actual
Gap between planned and actual volume by day/line.
Roll-out Speed
Typical time to stabilize one plant with templates.
Planners don’t have time to jump across 5–6 screens. We unify work orders, capacities, materials, and alerts in a single cockpit.
Jobs Released
36
+12% vs last week
Shortages
3
Click to open MRP radar
Plan vs Actual
96%
Target ≥ 95%
Changeovers
7
Grouped by flavor & pack size
Our engine is built around how factories really run – overlapping operations, shared resources, cleaning cycles, and campaign planning.
Unique Feature
Multi-constraint time buckets
Model machine, labor, tools, and utilities in the same horizon.
Unique Feature
Sequence-dependent setups
Reduce color/flavor/size changes with rule-based campaigns.
Instead of fighting over who is wrong, we show Sales, Marketing, and Production the same truth: what can be produced, when, and with which constraints.
Unique Feature
“What-if” slots by campaign
Simulate campaign uplift and see impact on capacity and RM/PM.
Result: -30–40% ad-hoc urgent campaigns.
Unique Feature
Scenario compare
Compare “Sales preferred” vs “Factory feasible” vs “Cost optimal”.
Result: faster S&OP decision within 1–2 hours instead of days.
Unique Feature
Comment & lock mechanism
Lock confirmed slots and keep track of who changed what and why.
Result: +20–30% reduction in internal disputes and re-approval cycles.
Our AI doesn’t just fill capacity – it can be tuned to minimize overtime, energy peaks, or total production cost.
We use templates for process, master data, and KPIs so you can replicate success quickly across plants, countries, and product categories.
Rollout Blueprint
Governance & KPI Pack
Impact in Numbers
Move from "firefighting" to "orchestrating." Schedule a demo to see how our Finite Scheduler handles your complex constraints.